Your Building's
First Impression
Is Measured In
Fingerprints
Per Square Foot.
Connaught Place · Aerocity · Golf Course Road · Defence Colony
850+
Buildings Cleaned
IRATA
Grade II Certified
₹5 Cr
Insurance Coverage

Ready to Schedule?
Site surveys completed within 48 hours.
Four Stages.
Zero Compromises.
Every Gleam crew follows the same documented protocol on a 32nd-floor curtain wall as on a ground-floor showroom. The sequence is non-negotiable because Delhi's construction dust, monsoon grime, and hard water demand a system — not a routine.
Pre-Rinse
High-pressure deionised water flush removes loose dust, bird deposits, and construction particulate from the glass surface and frame joints.
Pressure: 800–1200 PSI · Water: DI-filtered, <10 PPM TDS
Agitation
pH-neutral, low-foam detergent is worked into the glass with boar-bristle scrubbers or microfibre sleeves, targeting mineral deposits and silicone staining.
Dwell time: 90 sec · Solution: ISO 9001 certified concentrate
Extraction
Straight-pull squeegee technique with zero-residue silicone rubber removes contaminated solution in a single stroke — no re-wetting, no cross-contamination.
Ettore Pro channels · Replaced every 3,000 sq ft
Spot-Free Rinse
Final pure-water rinse using reverse-osmosis fed water eliminates all dissolved solids, leaving glass that dries without watermarks under Delhi's hard water conditions.
RO water: <5 PPM · Air-dried · No chamois contact

Stage 03 — Extraction · Golf Course Road, Gurgaon
Every Rope.
Every Anchor.
Documented.
A facility manager's duty of care doesn't end at the building perimeter. We provide full method statements, risk assessments, and insurance certificates before any crew sets foot on your roof. If your HSE officer asks for it, we have it.
Industrial Rope Access Trade Association
All supervisors hold active Grade II certifications, renewed every 3 years with mandatory re-assessment.
Window & Façade Services Guild
Adherence to WFSG Code of Practice for high-rise façade access, risk assessment documentation, and method statements.
New India Assurance — Active Policy
Full public liability and employer's liability cover for every site. Certificate available on request before any mobilisation.
Bureau of Indian Standards
Equipment, harness systems, and anchor points meet IS 3521 industrial safety belt standards for working at height.



Zero recordable incidents
since 2019 · 850+ buildings · 4.2 lakh sq ft cleaned annually
The Results
Speak Clearly.
We manage eleven buildings on Golf Course Road. Before Gleam, every vendor gave us the same story: bucket trucks, three-day shutdowns, tenants complaining about blocked sightlines. Gleam mobilised in four hours, rigged from the roof, and had Building 7's entire curtain wall done by 6 PM. The facilities committee didn't even know it happened until they looked out their windows the next morning.
We've renewed the AMC three years running. The before-and-after documentation they provide is exactly what the building owner wants to see at every quarterly review.

Rajesh Malhotra
Senior Facility Manager · Prestige Golf Course IT Park
Drag to compare · Building 7, Golf Course Road


What Moves
The Number.
There's no fixed per-pane rate that works across a 4-storey Defence Colony bungalow and a 38-storey Aerocity tower. Three variables drive every quote: how many floors, what glass coating, and how hard the access is. Use the estimator below to orient yourself before we visit.
Estimate Orientation
+18%
Access surcharge
1×
Glass multiplier
MEWP or rope depending on site · Plain Float glass. Final pricing depends on glass area (sq ft), access equipment availability, and frequency. The site survey locks in the exact number.
Get Exact QuoteAccess Difficulty Scale
Ladder / MEWP accessible
MEWP or rope depending on site
Rope access mandatory
Rope access + additional rigging
AMC Discounts Available
Annual Maintenance Contracts covering quarterly or bi-annual cleans attract 12–22% off the per-visit rate, plus priority scheduling before Diwali and monsoon season.
Not Ready to Book Yet?
Download Our AMC Rate Card
Per-visit and annual rates across building categories — from a 4-floor bungalow in Defence Colony to a 35-floor IT park in Aerocity. No obligation, no follow-up call unless you ask.
We'll Come.
We'll Measure.
You'll Know
The Exact Cost.
Our estimator visits your site, measures the glass area, assesses access complexity, and delivers a line-item quote within 24 hours. No ballpark figures — just a number you can put in a committee paper.
Survey completed in under 90 minutes
Quote delivered within 24 hours
IRATA-certified crew for every project
Zero deposit required to book